Looking for an independent and efficient partner in the oil industry to take care of your wholesale and retail trade? Do you desire around the clock access to all types of fuels and cannot afford long waiting times? Welcome to HGM Energy GmbH.

HGM Energy has 40 years of experience as a reliable partner in the international mineral and bio-fuels business and with many small independent bio- and mineral fuel companies.

We have recently increased our storage capacity to 130,000 cbm and have increased our turn-around times at our rail terminal with the addition of a second rail tanker platform. What are you waiting for?

The HGM Terminal is located in Bremen port with quick and easy transport links.


Jetty I

Unloading A I (max. 1.000 m3/h)
and A III (max. 1.000 m3/h)

Jetty II

Unloading and Loading A III
(380 m3/h)

A III fuel

6 tanks with 200 cbm
bis 5.150 cbm storage capacity

A I fuel

2 tanks each with 2.000 cbm
and 2 tanks with 200 cbm
storage capacity

A I- and A III fuel

with 3.400 cbm
and 2 tanks with 500 cbm
storage capacity

A I and A III,
Palmoil and Bi fuel


4 heated tanks each with 8.940 cbm storage capacity

A I- and A III fuel

2 tanks each with 7.200 cbm
and a Tank with 5.100 cbm
storage capacity

Tanker filling station

Track 1: Bottomloading
DK / SK E5 / SK E10 / Palmoil

Track 2: Bottomloading
Euro-DK / DK / SK E10 / SK E5

Track 3: Bottomloading HEL, SK E5, SK E10, SK plus, 2 x DK

Track 4: Bottomloading
HEL / SK E10 / SK E5 / DK

Track 5: Bottomloading
SK Plus / SK E10 / SK E5 / DK / E85 / HEL

Rail tanker station I

Rail Tanker (1.350 t)
Loading and unloading
Unloading- and loadingtime: 10h

Rail tanker station II

Rail Tanker (1.350 t)
Loading and unloading
Unloading- and loadingtime: 10h

Offices

Building
Windhukstreet 3

Offices

Building
Windhukstreet 1

A I and A III

fuel 4 tanks each with 8.490 cbm storage capacity