The HGM Terminal has two docks that serve barges and ocean tankers up to 220 m long, 32.30 m wide, and 10.50 m deep wide. The dock operates around the clock.
Jetty 1 - Loading Pier:
- Petrol: unload up to 1,000 m³/hr. - load up to 300 m³/hr.
- Fuel oil/diesel: unload up to 2,000 m³/hr. - load up to 1.000 m³/hr.
Jetty 2 - Pier for bunker:
- Bunker oil / gasoil: load and unload 380 m³/hr.