Jetty I
Unloading A I (max. 1.000 m3/h)
and A III (max. 1.000 m3/h)
Loading AI und A III (max 1.000m3/h)
Jetty II
Unloading and Loading A III
(380 m3/h)
A III fuel
6 tanks with 200 cbm
bis 5.150 cbm storage capacity
A III fuel
2 tanks each with
8.490 cbm storage capacity
A I fuel
2 tanks each with 2.000 cbm
and 2 tanks with 200 cbm
storage capacity
A I- and A III fuel
each with 3.400 cbm
and 2 tanks with 500 cbm
storage capacity
A I and A III,
Palmoil and Bi fuel
4 heated tanks each with 8.940 cbm storage capacity
A I- and A III fuel
2 tanks each with 7.200 cbm
and a Tank with 5.100 cbm
storage capacity
Tanker filling station
Track 1: Bottomloading
DK / SK E5 / SK E10 / Palmoil
Track 2: Bottomloading
Euro-DK / DK / SK E10 / SK E5
Track 3: Bottomloading HEL, SK E5, SK E10, SK plus, 2 x DK
Track 4: Bottomloading
HEL / SK E10 / SK E5 / DK
Track 5: Bottomloading
SK Plus / SK E10 / SK E5 / DK / E85 / HEL
Rail tanker station I
Rail Tanker (1.350 t)
Loading and unloading
Unloading- and loadingtime: 10h
Rail tanker station II
Rail Tanker (1.350 t)
Loading and unloading
Unloading- and loadingtime: 10h
Offices
Building
Windhukstreet 3
Offices
Building
Windhukstreet 1
A I and A III
fuel 4 tanks each with 8.490 cbm storage capacity
Additive tanks
8 x 12,5 cbm additive 2 x 50 cbm recovery tanks