Menu

A warm welcome!

We look forward to your visit and of being of service to you. The link below will provide you with directions and all necessary forms (in German) as a PDF file. For further information and assistance please do not hesitate to contact us:

HGM Energy GmbH
Windhukstra├če 1- 3
D-28237 Bremen
Germany

Tel. +49 (421) 649 20- 0
Fax +49 (421) 644 12 58
Email info(at)hgm-energy.com

Directions

 

 

The HGM Terminal offers continuous loading times between Sunday midnight and Saturday noon.

 

Downloads:

Tanklagerordnung
Tanklagerordnung_Anhang_Teil1
Anschreiben ID-Karte
Anmeldung Fahrer
Rundschreiben Speditionen
Meldung zur GGVS
HGM Jetty 1 ship figures


Jetty I

Unloading A I (max. 1.000 m3/h)
and A III (max. 1.000 m3/h)

Loading AI und A III (max 1.000m3/h)

Jetty II

Unloading and Loading A III
(380 m3/h)

A III fuel

6 tanks with 200 cbm
bis 5.150 cbm storage capacity

A III fuel

2 tanks each with
8.490 cbm storage capacity

A I fuel

2 tanks each with 2.000 cbm
and 2 tanks with 200 cbm
storage capacity

A I- and A III fuel

each with 3.400 cbm
and 2 tanks with 500 cbm
storage capacity

A I and A III,
Palmoil and Bi fuel


4 heated tanks each with 8.940 cbm storage capacity

A I- and A III fuel

2 tanks each with 7.200 cbm
and a Tank with 5.100 cbm
storage capacity

Tanker filling station

Track 1: Bottomloading
DK / SK E5 / SK E10 / Palmoil

Track 2: Bottomloading
Euro-DK / DK / SK E10 / SK E5

Track 3: Bottomloading HEL, SK E5, SK E10, SK plus, 2 x DK

Track 4: Bottomloading
HEL / SK E10 / SK E5 / DK

Track 5: Bottomloading
SK Plus / SK E10 / SK E5 / DK / E85 / HEL

Rail tanker station I

Rail Tanker (1.350 t)
Loading and unloading
Unloading- and loadingtime: 10h

Rail tanker station II

Rail Tanker (1.350 t)
Loading and unloading
Unloading- and loadingtime: 10h

Offices

Building
Windhukstreet 3

Offices

Building
Windhukstreet 1

A I and A III

fuel 4 tanks each with 8.490 cbm storage capacity

Additive tanks

8 x 12,5 cbm additive 2 x 50 cbm recovery tanks